
Level Switch FAT – Magnetrol, Belgium
During the visit, Hydro test for level switches were witnessed per Hydro test procedure which including pressure of 451 psi
Continue readingExperienced Industrial Supplier, Professional In Inspection Services
During the visit, Hydro test for level switches were witnessed per Hydro test procedure which including pressure of 451 psi
Continue readingThe evaluation inspection carried out at the manufacturing site and in summary 3 steps of control are defined: (I) R&D
Continue readingFollowing Stages Inspection Carried out as per FAT documents and found satisfactory: Visual, label control and quantity verification and found
Continue readingAt the Sulzer site, the documentation was controlled. In particular Noise level certificates, vibration measurements, temperature measurement report, final painting
Continue readingDuring the visit, the test for verification of water proof of the joint box has been witnesses. The pressure inside
Continue readingDuring the visit, the Visual and appearance of UHP Grade Graphite Electrodes units has been controlled. No serious damage was
Continue readingThe final stage of the HIC test was witnessed in which the operator of the lab was scanning the prepared
Continue reading